South Middle
School
Project Overview
The Rapid City Area School District has a new middle School on the southeast part of the City. The modern facility has numerous features to enhance the student experience. Along with standard classrooms with multiple break-out spaces, the school boasts a CTE Production Lab, dedicated STEM Classrooms, large Band/Music Room, Orchestra Room, , Family and Consumer Sciences (FACS) Classroom, and a 300-seat Commons with stage and production capabilities. The Special Education program has specialized spaces including a Simulated Home Training Area. Sports facilities include a competition gym with large locker rooms and a referee/officials locker room, a fitness center, and a new outdoor track and football field. Multiple entrances relieve pressure at any one entrance. A large crawl space houses all of the mechanical including the Geothermal and Ice Storage Systems that make up the High Efficiency HVAC.
South Middle
School
Project Overview
The Rapid City Area School District has a new middle School on the southeast part of the City. The modern facility has numerous features to enhance the student experience. Along with standard classrooms with multiple break-out spaces, the school boasts a CTE Production Lab, dedicated STEM Classrooms, large Band/Music Room, Orchestra Room, , Family and Consumer Sciences (FACS) Classroom, and a 300-seat Commons with stage and production capabilities. The Special Education program has specialized spaces including a Simulated Home Training Area. Sports facilities include a competition gym with large locker rooms and a referee/officials locker room, a fitness center, and a new outdoor track and football field. Multiple entrances relieve pressure at any one entrance. A large crawl space houses all of the mechanical including the Geothermal and Ice Storage Systems that make up the High Efficiency HVAC.
Project Details
Architect
MOA Architects
Division Manager
Mike Charnholm
Project Manager
Dustin Schilling
Assistant Project Manager
Jake Losett
Superintendent
Don Carlson
Owner
Rapid City Area School District
Delivery Method
CMAR
Size
40,000 sf

